Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0213 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,647 | $100 | Not Implemented |
UA0213 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,098 | $4,895 | Implemented |
UA0213 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,549 | $1,294 | Implemented |
UA0213 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,067 | $30,000 | Not Implemented |
UA0213 # 06 Y:2019 | 06 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,399 | $4,370 | Not Implemented |
UA0214 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,674 | $35,762 | Implemented |
UA0214 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,341 | $8,495 | Implemented |
UA0214 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,118 | $50 | Implemented |
UA0214 # 04 Y:2019 | 04 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,099 | $7,241 | Implemented |
UA0214 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,824 | $6,704 | Implemented |
UA0214 # 06 Y:2019 | 06 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $58,766 | $50 | Not Implemented |
UA0214 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $57,024 | $7,375 | Implemented |
UA0214 # 08 Y:2019 | 08 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $33,548 | $5,698 | Not Implemented |
UA0214 # 09 Y:2019 | 09 | 2019 | PAY UTILITY BILLS ON TIME | $9,417 | $0 | Implemented |
UK1906 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $483 | $1,100 | n/a |
UK1906 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,725 | $0 | n/a |
UK1906 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,355 | $2,630 | n/a |
UK1906 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,341 | $2,275 | n/a |
UK1906 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $288 | $1,045 | n/a |
UK1906 # 06 Y:2019 | 06 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,304 | $660 | n/a |
UK1906 # 07 Y:2019 | 07 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,766 | $0 | n/a |
UK1906 # 08 Y:2019 | 08 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,392 | $0 | n/a |
UK1906 # 09 Y:2019 | 09 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $8,769 | $4,160 | n/a |
UK1906 # 10 Y:2019 | 10 | 2019 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $107 | $223 | n/a |
UK1906 # 11 Y:2019 | 11 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,742 | $0 | n/a |