Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented
SU0517 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $126 $0 Implemented
SU0517 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $119 $0 Implemented
SU0517 # 03 Y:2022 03 2022 DISCONNECT BALLASTS $268 $0 Not Implemented
SU0517 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $988 $102 Implemented
SU0517 # 05 Y:2022 05 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,854 $675 Implemented
SU0517 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $364 $310 Implemented
UF0583 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,276 $1,243,750 Implemented
UF0583 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,987 $62,001 Implemented
UF0583 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,746 $33,000 Implemented
UF0583 # 04 Y:2022 04 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,240 $0 Implemented
UF0583 # 05 Y:2022 05 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $273,973 $0 Not Implemented
UF0583 # 06 Y:2022 06 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $58,774 $10,000 Not Implemented
UD1046 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,214 $200,000 Implemented
UD1046 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,323 $0 Not Implemented
UD1046 # 03 Y:2022 03 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $261,813 $100 Not Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented
UD1046 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,795 $3,279 Not Implemented
UD1046 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,166 $0 Implemented
UD1046 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $12,615 $1,500 Not Implemented
UD1046 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27,755 $60,000 Not Implemented
UD1046 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,495 $1,200 Not Implemented