IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,197

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0260 # 11 Y:1992 11 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $106 $900 Implemented
CO0260 # 12 Y:1992 12 1992 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,750 $20,280 Implemented
CO0260 # 13 Y:1992 13 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,130 $2,870 Implemented
CO0260 # 14 Y:1992 14 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $820 $2,610 Implemented
OK0391 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,850 $73,884 Not Implemented
OK0391 # 02 Y:1992 02 1992 KEEP LAMPS AND REFLECTORS CLEAN $2,101 $4,704 Not Implemented
OK0391 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $302 $0 Implemented
OK0391 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $472 $444 Not Implemented
OK0391 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $966 $1,880 Implemented
OK0391 # 06 Y:1992 06 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,908 $4,518 Not Implemented
OR0165 # 01 Y:1992 01 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,045 $500 Implemented
OR0165 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,788 $0 Implemented
OR0165 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $0 Not Implemented
OR0165 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $1,074 $2,250 Implemented
OR0165 # 05 Y:1992 05 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $830 $0 Implemented
OR0165 # 06 Y:1992 06 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $320 $824 Implemented
IA0038 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,039 $9,600 Not Implemented
IA0038 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,673 $2,484 Not Implemented
IA0038 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,907 $150 Implemented
IA0038 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $25 Not Implemented
IA0038 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $693 $1,875 Not Implemented
IA0038 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,925 $1,926 Not Implemented
IA0039 # 01 Y:1992 01 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $6,617 $15,000 Not Implemented
IA0039 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $744 $600 Not Implemented
IA0039 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,769 $360 Not Implemented