IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,175

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0046 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $62 $200 Not Implemented
AM0163 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $18,300 $35,000 Implemented
AM0163 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $2,440 $1,240 Implemented
AM0163 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,420 $1,360 Not Implemented
AM0163 # 04 Y:1992 04 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $620 $270 Not Implemented
AM0163 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $330 $0 Implemented
AM0164 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $93,089 $0 Implemented
AM0164 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $44,815 $64,750 Implemented
AM0164 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $19,440 $850 Not Implemented
AM0164 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $1,030 Implemented
AM0164 # 05 Y:1992 05 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,200 $419 Not Implemented
AM0164 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,140 $910 Implemented
AS0072 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,429 $20,000 Not Implemented
AS0072 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,357 $6,496 Not Implemented
AS0072 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,399 $42,903 Not Implemented
AS0072 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,586 $0 Not Implemented
AS0072 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,491 $291 Not Implemented
AS0072 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,155 $14,207 Not Implemented
AS0072 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,653 $342 Not Implemented
AS0072 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $12,667 $11,960 Not Implemented
AS0072 # 09 Y:1992 09 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,161 $10,760 Not Implemented
AS0072 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $100 Not Implemented
AS0073 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,226 $5,173 Implemented
AS0073 # 02 Y:1992 02 1992 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,610 $9,350 Implemented
AS0073 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $245 $400 Implemented