Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0066 # 03 Y:2011 | 03 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $22,864 | $30,000 | Implemented |
UA0066 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,677 | $640 | Implemented |
UA0066 # 05 Y:2011 | 05 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $22,848 | $11,400 | Implemented |
UA0066 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,887 | $13,568 | Implemented |
UA0066 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $100,439 | $14,349 | Not Implemented |
UA0066 # 08 Y:2011 | 08 | 2011 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $26,728 | $64,000 | Not Implemented |
UA0066 # 09 Y:2011 | 09 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,013 | $1,266 | Not Implemented |
UA0066 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,963 | $3,900 | Implemented |
UA0065 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,459 | $24,444 | Not Implemented |
UA0065 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $668 | $1,241 | Implemented |
UA0065 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,025 | $800 | Not Implemented |
UA0065 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $702 | $1,100 | Implemented |
UA0065 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $832 | $1,935 | Not Implemented |
UA0065 # 06 Y:2011 | 06 | 2011 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $510 | $1,533 | Not Implemented |
UA0064 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,684 | $5,000 | Implemented |
UA0064 # 02 Y:2011 | 02 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $52,970 | $54,000 | Not Implemented |
UA0064 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,660 | $800 | Implemented |
UA0064 # 04 Y:2011 | 04 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $52,129 | $12,420 | Not Implemented |
UA0063 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,438 | $23,295 | Implemented |
UA0063 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,938 | $1,003 | Implemented |
UA0063 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,580 | $100 | Not Implemented |
UA0063 # 04 Y:2011 | 04 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $28,528 | $3,584 | Implemented |
UA0063 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,417 | $1,000 | Implemented |
UA0063 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,363 | $3,900 | Implemented |
UA0063 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $524 | $202 | Not Implemented |