IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0450 # 06 Y:2012 06 2012 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $632 $2,035 Not Implemented
NC0450 # 07 Y:2012 07 2012 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $113,534 $25,000 Implemented
NC0450 # 08 Y:2012 08 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $105,000 $40,000 Implemented
NC0450 # 09 Y:2012 09 2012 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $38,389 $30,000 Implemented
NC0450 # 10 Y:2012 10 2012 IMPROVE SPACE COMFORT CONDITIONING $4,739 $8,000 Not Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 04 Y:2012 04 2012 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,656 $1,800 Not Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
NC0449 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,096 $50,000 Not Implemented
NC0449 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $883 $1,560 Implemented
NC0449 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,300 $10,168 Implemented
NC0449 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,288 $37,820 Not Implemented
NC0449 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,027 $6,500 Not Implemented
NC0449 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $3,200 Not Implemented
NC0454 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,289 $5,115 Implemented
NC0454 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,774 $900 Implemented
NC0454 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,836 $175 Implemented
NC0454 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $454 $225 Implemented
NC0454 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $134 $529 Not Implemented
NC0454 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,318 $15,000 Not Implemented
NC0454 # 07 Y:2012 07 2012 IMPROVE SPACE COMFORT CONDITIONING $41,033 $60,000 Not Implemented
NC0452 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,629 $10,000 Implemented