Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0030 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,624 | $1,800 | Implemented |
UU0030 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,250 | $390 | Implemented |
UU0030 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $379 | $240 | Not Implemented |
UU0030 # 04 Y:2002 | 04 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $929 | $200 | Not Implemented |
UU0030 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,080 | $1,843 | Not Implemented |
UU0030 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $808 | $0 | Not Implemented |
UU0030 # 07 Y:2002 | 07 | 2002 | USE SYNTHETIC LUBRICANT | $1,211 | $600 | Implemented |
UU0031 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $12,207 | $18,000 | Not Implemented |
UU0031 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,112 | $0 | Not Implemented |
UU0031 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,692 | $20 | Not Implemented |
UU0031 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $121,213 | $2,000,000 | Not Implemented |
UU0031 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58 | $366 | Not Implemented |
UU0029 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,710 | $0 | Not Implemented |
UU0029 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,000 | $1,570 | Implemented |
UU0029 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,840 | $8,250 | Not Implemented |
UU0029 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $290 | $530 | Not Implemented |
UU0029 # 05 Y:2002 | 05 | 2002 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $229 | $1,650 | Not Implemented |
UU0028 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $986 | $0 | Implemented |
UU0028 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $5,590 | $9,800 | Implemented |
UU0028 # 03 Y:2002 | 03 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,500 | $7,600 | Implemented |
UU0028 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,450 | $700 | Implemented |
UU0028 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $844 | $406 | Implemented |
UU0028 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,400 | $2,000 | Implemented |
UU0028 # 07 Y:2002 | 07 | 2002 | INSTALL SKYLIGHTS | $17,689 | $2,800 | Not Implemented |
UU0028 # 08 Y:2002 | 08 | 2002 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $147,880 | $100,000 | Not Implemented |