IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0312 # 08 Y:1998 08 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $8,025 $55,400 Not Implemented
OR0312 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,254 $1,000 Implemented
OR0312 # 10 Y:1998 10 1998 OPTIMIZE PLANT POWER FACTOR $2,358 $7,000 Not Implemented
OR0312 # 11 Y:1998 11 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,455 $4,459 Implemented
OR0310 # 01 Y:1997 01 1997 USE PLASTIC PALLETS INSTEAD OF WOOD $11,530 $1,830 Implemented
OR0310 # 02 Y:1997 02 1997 MOVE PRODUCT USING MECHANICAL MEANS $9,625 $14,810 Not Implemented
OR0310 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $4,309 $2,320 Not Implemented
OR0310 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,930 $8,750 Not Implemented
OR0310 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $2,500 Implemented
OR0310 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $670 Implemented
OR0310 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $698 $2,017 Not Implemented
OR0302 # 01 Y:1997 01 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $370,800 $345,000 Not Implemented
OR0302 # 02 Y:1997 02 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $78,667 $5,000 Implemented
OR0302 # 03 Y:1997 03 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $25,630 $73,000 Implemented
OR0302 # 04 Y:1997 04 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,448 $130,000 Implemented
OR0302 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,141 $8,464 Implemented
OR0302 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,613 $1,000 Not Implemented
OR0302 # 07 Y:1997 07 1997 UPGRADE CONTROLS ON COMPRESSORS $4,077 $1,210 Not Implemented
OR0302 # 08 Y:1997 08 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,300 $7,380 Not Implemented
OR0302 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $2,410 $3,200 Not Implemented
OR0302 # 10 Y:1997 10 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,223 $34,615 Implemented
OR0302 # 11 Y:1997 11 1997 ELIMINATE/REDUCE AN OPERATION $7,267 $420 Implemented
OR0302 # 12 Y:1997 12 1997 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $5,988 $300 Not Implemented
OR0301 # 01 Y:1997 01 1997 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $20,180 $2,500 Not Implemented
OR0301 # 02 Y:1997 02 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $45,520 $74,000 Not Implemented