IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0282 # 04 Y:2004 04 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,151 $0 Implemented
WV0282 # 05 Y:2004 05 2004 BURN WASTE OIL FOR HEAT $6,148 $3,760 Not Implemented
WV0282 # 06 Y:2004 06 2004 DEVELOP A REPAIR/REPLACE POLICY $3,646 $1,140 Implemented
WV0282 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,390 $4,448 Implemented
WV0282 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,521 $490 Not Implemented
WV0282 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,387 $250 Implemented
WV0282 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $923 $715 Implemented
WV0282 # 11 Y:2004 11 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $788 $614 Not Implemented
WV0282 # 12 Y:2004 12 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,784 $76 Implemented
WV0282 # 13 Y:2004 13 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,534 $250 Not Implemented
WV0282 # 14 Y:2004 14 2004 ISOLATE HOT OR COLD EQUIPMENT $5,688 $690 Implemented
WV0281 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $1,163 $38 Implemented
WV0281 # 01 Y:2003 01 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $52,226 $153,000 Not Implemented
WV0281 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,150 $1,695 Not Implemented
WV0281 # 03 Y:2003 03 2003 DEVELOP A REPAIR/REPLACE POLICY $1,940 $240 Implemented
WV0281 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,652 $1,000 Implemented
WV0280 # 01 Y:2003 01 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $143,927 $209,000 Not Implemented
WV0280 # 02 Y:2003 02 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $78,750 $1,000 Implemented
WV0280 # 03 Y:2003 03 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $63,438 $8,180 Not Implemented
WV0280 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $27,160 $750 Implemented
WV0280 # 05 Y:2003 05 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,943 $45,000 Not Implemented
WV0280 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,252 $750 Implemented
WV0280 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,348 $100 Implemented
WV0280 # 08 Y:2003 08 2003 BURN WASTE OIL FOR HEAT $4,718 $3,500 Not Implemented
WV0280 # 09 Y:2003 09 2003 USE SYNTHETIC LUBRICANT $4,705 $250 Implemented