IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0359 # 02 Y:1999 02 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $5,455 $24,000 Not Implemented
WI0359 # 03 Y:1999 03 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,831 $0 Not Implemented
WI0359 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,067 $1,000 Not Implemented
WI0359 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $100 Implemented
WI0359 # 06 Y:1999 06 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,781 $0 Implemented
WI0359 # 07 Y:1999 07 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,391 $500 Not Implemented
WI0359 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $872 $1,000 Not Implemented
WI0359 # 09 Y:1999 09 1999 REDUCE VENTILATION AIR $648 $500 Implemented
WI0359 # 10 Y:1999 10 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $0 Implemented
GT0672 # 01 Y:1999 01 1999 REDUCE FLUID FLOW RATES $4,090 $600 Implemented
GT0672 # 02 Y:1999 02 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,897 $5,660 Not Implemented
GT0672 # 03 Y:1999 03 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,500 $5,000 Implemented
GT0672 # 04 Y:1999 04 1999 FILTER AND REUSE HYDRAULIC OIL $1,950 $3,500 Not Implemented
GT0672 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,071 $51,281 Implemented
GT0672 # 06 Y:1999 06 1999 USE POWER DURING OFF-PEAK PERIODS $32,520 $0 Implemented
AR0170 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,421 $6,020 Implemented
AR0170 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $84 $60 Not Implemented
AR0170 # 03 Y:1999 03 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $113,600 $4,700 Not Implemented
AR0170 # 04 Y:1999 04 1999 IMPROVE SPACE COMFORT CONDITIONING $6,120 $1,916 Not Implemented
AS0260 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,960 $8,259 n/a
AS0260 # 02 Y:1999 02 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,591 $1,300 n/a
AS0260 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,200 $7,600 n/a
AS0260 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $423 $60 n/a
AS0260 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,157 $240 n/a
AS0260 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,639 $1,060 n/a