Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0167 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,327 | $151 | Implemented |
MS0167 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $1,698 | $1,845 | Not Implemented |
MS0167 # 05 Y:2000 | 05 | 2000 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $757 | $217 | Implemented |
AR0189 # 01 Y:2000 | 01 | 2000 | USE SYNTHETIC LUBRICANT | $2,906 | $0 | Not Implemented |
AR0189 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,227 | $5,679 | Not Implemented |
AR0189 # 03 Y:2000 | 03 | 2000 | SELL OIL TO RECYCLER | $1,436 | $1,500 | Not Implemented |
AR0189 # 04 Y:2000 | 04 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $269,892 | $15,800 | Not Implemented |
AR0189 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,249 | $110 | Not Implemented |
HO0235 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,960 | $11,729 | Not Implemented |
HO0235 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,410 | $15 | Not Implemented |
HO0235 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,255 | $600 | Implemented |
HO0235 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,126 | $5,000 | Implemented |
HO0235 # 05 Y:2000 | 05 | 2000 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $34,444 | $20,000 | Implemented |
HO0235 # 06 Y:2000 | 06 | 2000 | COMBINE UTILITY METERS | $4,142 | $6,000 | Not Implemented |
HO0235 # 07 Y:2000 | 07 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $115,354 | $4,000 | Not Implemented |
HO0235 # 08 Y:2000 | 08 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $4,200 | $375 | Implemented |
HO0235 # 09 Y:2000 | 09 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $524 | $2,500 | Implemented |
KU0545 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $12,740 | $4,370 | Implemented |
KU0545 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,420 | $15,470 | Implemented |
KU0545 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,890 | $20 | Implemented |
KU0545 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,580 | $1,150 | Implemented |
KU0545 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,510 | $1,770 | Implemented |
KU0545 # 06 Y:2000 | 06 | 2000 | COMBINE UTILITY METERS | $1,450 | $4,000 | Implemented |
KU0545 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,020 | $0 | Implemented |
KU0545 # 08 Y:2000 | 08 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $19,600 | $11,400 | Not Implemented |