IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0116 # 05 Y:2005 05 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,307 $47 Not Implemented
MI0116 # 06 Y:2005 06 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,244 $759 Not Implemented
MI0116 # 07 Y:2005 07 2005 PAY BILLS ON TIME TO AVOID LATE FEES $1,267 $0 Implemented
MS0281 # 01 Y:2005 01 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $79,041 $295,888 Not Implemented
MS0281 # 02 Y:2005 02 2005 COMBINE UTILITY METERS $12,247 $0 Not Implemented
MS0281 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $2,683 $1,211 Not Implemented
MS0281 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $2,668 $800 Not Implemented
MS0281 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,603 $2,508 Not Implemented
MS0281 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,380 $243 Not Implemented
MS0281 # 07 Y:2005 07 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,009 $855 Implemented
MS0281 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $901 $176 Implemented
MS0281 # 09 Y:2005 09 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $809 $0 Implemented
MS0281 # 10 Y:2005 10 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $782 $405 Implemented
MS0281 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $444 $1,485 Not Implemented
MS0281 # 12 Y:2005 12 2005 USE PHOTOCELL CONTROLS $405 $148 Not Implemented
MS0281 # 13 Y:2005 13 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $371 $0 Implemented
MA0584 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,369 $2,100 Implemented
MA0584 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,880 $2,800 Implemented
MA0584 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $3,727 $11,326 Not Implemented
MA0584 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,152 $1,400 Implemented
MA0584 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,098 $9,400 Not Implemented
IA0370 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,492 Implemented
IA0370 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,415 $45 Not Implemented
IA0370 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,432 $955 Not Implemented
IA0370 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,500 $20,993 Implemented