IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0557 # 01 Y:2020 01 2020 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $232 $0 Not Implemented
SF0557 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,387 $350 Not Implemented
SF0557 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $14,452 $19,258 Not Implemented
SF0557 # 04 Y:2020 04 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,850 $4,249 Not Implemented
SD0597 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,822 $17,000 Not Implemented
SD0597 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,897 $3,900 Not Implemented
SD0597 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,547 $225 Implemented
SD0597 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,307 $5,611 Not Implemented
SD0597 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $691 $1,720 Not Implemented
SD0596 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,809 $30,150 Not Implemented
SD0596 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,628 $300 Not Implemented
SD0596 # 03 Y:2020 03 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,037 $2,560 Not Implemented
SD0596 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,711 $0 Not Implemented
SF0556 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,802 $0 Implemented
SF0556 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,683 $575 Implemented
SF0556 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $959 $60 Implemented
SF0556 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,769 $2,289 Implemented
SF0556 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,729 $864 Implemented
SF0556 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,238 $5,536 Implemented
SF0556 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,455 $3,366 Implemented
SF0556 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,676 $16,092 Implemented
SF0556 # 09 Y:2020 09 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $57,865 $348,493 Implemented
SF0556 # 10 Y:2020 10 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,250 $1,064 Not Implemented
SD0595 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,029 $300 Not Implemented
SD0595 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $629 $0 Not Implemented