Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0504 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $117,765 | $284,800 | Not Implemented |
MA0504 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,477 | $22,000 | Implemented |
MA0504 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,725 | $46,000 | Not Implemented |
MA0502 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,860 | $45,850 | Not Implemented |
MA0502 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,998 | $40,000 | Not Implemented |
MA0502 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,461 | $6,200 | Not Implemented |
MA0502 # 04 Y:2001 | 04 | 2001 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,510 | $15,000 | Not Implemented |
MA0502 # 05 Y:2001 | 05 | 2001 | REPLACE BOILER | $1,908 | $1,908 | Not Implemented |
MA0502 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,771 | $3,000 | Not Implemented |
MA0499 # 01 Y:2001 | 01 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $268,341 | $500,000 | Not Implemented |
MA0499 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,270 | $154,000 | Not Implemented |
MA0499 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,963 | $9,960 | Not Implemented |
MA0499 # 04 Y:2001 | 04 | 2001 | USE MINIMUM SAFE OVEN VENTILATION | $7,334 | $14,200 | Not Implemented |
MA0499 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,936 | $12,650 | Not Implemented |
MA0499 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,235 | $255 | Not Implemented |
MA0499 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,219 | $2,000 | Not Implemented |
MA0498 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,844 | $60,000 | Implemented |
MA0498 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,867 | $0 | Implemented |
MA0498 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,790 | $35,000 | Not Implemented |
MA0498 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,980 | $0 | Implemented |
MA0498 # 05 Y:2001 | 05 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,300 | $13,000 | Implemented |
MA0498 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,132 | $25,540 | Implemented |
MA0498 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $808 | $2,000 | Not Implemented |
MA0498 # 08 Y:2001 | 08 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $228 | $45 | Implemented |
MA0493 # 01 Y:2001 | 01 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $48,702 | $180,000 | Not Implemented |