Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
1,615
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0134 # 05 Y:1994 | 05 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $546 | $400 | Not Implemented |
ME0133 # 01 Y:1994 | 01 | 1994 | OPTIMIZE PLANT POWER FACTOR | $2,688 | $4,500 | Not Implemented |
ME0133 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,453 | $6,650 | Not Implemented |
ME0133 # 03 Y:1994 | 03 | 1994 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $5,276 | $7,200 | Not Implemented |
ME0132 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,797 | $300 | Implemented |
ME0132 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $363 | $175 | Not Implemented |
ME0132 # 03 Y:1994 | 03 | 1994 | INSULATE BARE EQUIPMENT | $1,625 | $5,100 | Not Implemented |
ME0132 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,931 | $500 | Implemented |
ME0132 # 05 Y:1994 | 05 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $792 | $0 | Implemented |
ME0132 # 06 Y:1994 | 06 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $944 | $400 | Implemented |
ME0132 # 07 Y:1994 | 07 | 1994 | REPAIR AND ELIMINATE STEAM LEAKS | $286 | $75 | Implemented |
ME0132 # 08 Y:1994 | 08 | 1994 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $4,892 | $1,200 | Not Implemented |
ME0130 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,418 | $150 | Implemented |
ME0130 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $20,697 | $40,000 | Not Implemented |
ME0130 # 03 Y:1994 | 03 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $899 | $1,300 | Not Implemented |
ME0130 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,470 | $8,260 | Not Implemented |
ME0130 # 05 Y:1994 | 05 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,530 | $15,100 | Not Implemented |
ME0120 # 01 Y:1994 | 01 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,173 | $80,000 | Implemented |
ME0120 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $658 | $200 | Implemented |
ME0120 # 03 Y:1994 | 03 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $263 | $6,000 | Not Implemented |
ME0120 # 04 Y:1994 | 04 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $205 | $400 | Not Implemented |
ME0120 # 05 Y:1994 | 05 | 1994 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,905 | $1,500 | Not Implemented |
ME0131 # 01 Y:1994 | 01 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,084 | $7,000 | Not Implemented |
ME0131 # 02 Y:1994 | 02 | 1994 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $690,090 | $1,600,000 | Not Implemented |
ME0131 # 03 Y:1994 | 03 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,130 | $41,000 | Not Implemented |