Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0792 # 10 Y:2010 | 10 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,203 | $109,200 | Not Implemented |
OK0792 # 11 Y:2010 | 11 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,037 | $78,057 | Not Implemented |
OK0791 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $900 | $3,735 | Implemented |
OK0791 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,255 | $3,402 | Implemented |
OK0791 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,392 | $12,540 | Not Implemented |
OK0791 # 07 Y:2010 | 07 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,122 | $8,027 | Not Implemented |
OK0791 # 08 Y:2010 | 08 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,026 | $11,800 | Not Implemented |
OK0791 # 09 Y:2010 | 09 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,130 | $1,244 | Not Implemented |
OK0791 # 10 Y:2010 | 10 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,687 | $915 | Not Implemented |
OK0791 # 11 Y:2010 | 11 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,764 | $1,050 | Implemented |
OK0791 # 12 Y:2010 | 12 | 2010 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $655 | $0 | Not Implemented |
OK0791 # 13 Y:2010 | 13 | 2010 | INSTALL SET-BACK TIMERS | $684 | $1,024 | Not Implemented |
OK0791 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $65,369 | $268,762 | Not Implemented |
OK0791 # 02 Y:2010 | 02 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,321 | $7,025 | Not Implemented |
OK0791 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,782 | $61,666 | Not Implemented |
OK0790 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $22,023 | $495,980 | Not Implemented |
OK0790 # 02 Y:2010 | 02 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,353 | $30,200 | Not Implemented |
OK0790 # 03 Y:2010 | 03 | 2010 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $32,076 | $0 | Implemented |
OK0790 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,083 | $4,638 | Not Implemented |
OK0790 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,871 | $1,750 | Implemented |
OK0790 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $810 | $0 | Not Implemented |
OK0790 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $3,031 | $11,550 | Not Implemented |
OK0790 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $20,203 | Implemented |
OK0790 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,084 | $9,806 | Not Implemented |
OK0790 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $13 | Implemented |