IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0792 # 10 Y:2010 10 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,203 $109,200 Not Implemented
OK0792 # 11 Y:2010 11 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,037 $78,057 Not Implemented
OK0791 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $3,735 Implemented
OK0791 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $3,402 Implemented
OK0791 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,392 $12,540 Not Implemented
OK0791 # 07 Y:2010 07 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,122 $8,027 Not Implemented
OK0791 # 08 Y:2010 08 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,026 $11,800 Not Implemented
OK0791 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,130 $1,244 Not Implemented
OK0791 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,687 $915 Not Implemented
OK0791 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,764 $1,050 Implemented
OK0791 # 12 Y:2010 12 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $655 $0 Not Implemented
OK0791 # 13 Y:2010 13 2010 INSTALL SET-BACK TIMERS $684 $1,024 Not Implemented
OK0791 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $65,369 $268,762 Not Implemented
OK0791 # 02 Y:2010 02 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,321 $7,025 Not Implemented
OK0791 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,782 $61,666 Not Implemented
OK0790 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $22,023 $495,980 Not Implemented
OK0790 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,353 $30,200 Not Implemented
OK0790 # 03 Y:2010 03 2010 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $32,076 $0 Implemented
OK0790 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,083 $4,638 Not Implemented
OK0790 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,871 $1,750 Implemented
OK0790 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $810 $0 Not Implemented
OK0790 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $3,031 $11,550 Not Implemented
OK0790 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $20,203 Implemented
OK0790 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $9,806 Not Implemented
OK0790 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $13 Implemented