Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0260 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,300 | $30 | n/a |
AS0260 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $970 | $0 | n/a |
AR0167 # 01 Y:1999 | 01 | 1999 | INSTALL OCCUPANCY SENSORS | $5,846 | $2,240 | Implemented |
AR0167 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,264 | $5,441 | Implemented |
AR0167 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,657 | $250 | Implemented |
AR0167 # 04 Y:1999 | 04 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $7,742 | $205 | Implemented |
AR0167 # 05 Y:1999 | 05 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,523 | $0 | Implemented |
AR0167 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,567 | $200 | Implemented |
AR0167 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,681 | $8,274 | Not Implemented |
AR0167 # 08 Y:1999 | 08 | 1999 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $2,390,400 | $4,500,000 | Not Implemented |
AR0167 # 09 Y:1999 | 09 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,707 | $1,791 | Implemented |
AR0167 # 10 Y:1999 | 10 | 1999 | USE OPTIMUM THICKNESS INSULATION | $86,793 | $85,710 | Not Implemented |
AR0167 # 11 Y:1999 | 11 | 1999 | AUTOMATE FINISHING PROCESS | $80,703 | $51,700 | Not Implemented |
KU0526 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,050 | $10,000 | Not Implemented |
KU0526 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,600 | $810 | Not Implemented |
KU0526 # 03 Y:1999 | 03 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,000 | $0 | Not Implemented |
KU0526 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $700 | $1,050 | Not Implemented |
KU0526 # 05 Y:1999 | 05 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $52,280 | $151,000 | Not Implemented |
UM0150 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,828 | $1,500 | Not Implemented |
UM0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $300 | Implemented |
UM0150 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,067 | $880 | Not Implemented |
UM0150 # 04 Y:1999 | 04 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,923 | $1,750 | Not Implemented |
UM0150 # 05 Y:1999 | 05 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $35,216 | $50,000 | Not Implemented |
ND0333 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,452 | $2,000 | Not Implemented |
ND0333 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $855 | $220 | Implemented |