IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0260 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,300 $30 n/a
AS0260 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $970 $0 n/a
AR0167 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $5,846 $2,240 Implemented
AR0167 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,264 $5,441 Implemented
AR0167 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,657 $250 Implemented
AR0167 # 04 Y:1999 04 1999 REPAIR AND ELIMINATE STEAM LEAKS $7,742 $205 Implemented
AR0167 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,523 $0 Implemented
AR0167 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,567 $200 Implemented
AR0167 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,681 $8,274 Not Implemented
AR0167 # 08 Y:1999 08 1999 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $2,390,400 $4,500,000 Not Implemented
AR0167 # 09 Y:1999 09 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $3,707 $1,791 Implemented
AR0167 # 10 Y:1999 10 1999 USE OPTIMUM THICKNESS INSULATION $86,793 $85,710 Not Implemented
AR0167 # 11 Y:1999 11 1999 AUTOMATE FINISHING PROCESS $80,703 $51,700 Not Implemented
KU0526 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,050 $10,000 Not Implemented
KU0526 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,600 $810 Not Implemented
KU0526 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $1,000 $0 Not Implemented
KU0526 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,050 Not Implemented
KU0526 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $52,280 $151,000 Not Implemented
UM0150 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,828 $1,500 Not Implemented
UM0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $300 Implemented
UM0150 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,067 $880 Not Implemented
UM0150 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,923 $1,750 Not Implemented
UM0150 # 05 Y:1999 05 1999 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $35,216 $50,000 Not Implemented
ND0333 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,452 $2,000 Not Implemented
ND0333 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $220 Implemented