IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0436 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,180 $2,000 Implemented
SD0436 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $7,888 $6,050 Implemented
SD0436 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,787 $1,535 Implemented
SD0436 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,197 $22,700 Not Implemented
SD0436 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,598 $52,274 Implemented
SD0436 # 07 Y:2011 07 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $12,828 $20,000 Implemented
SD0436 # 08 Y:2011 08 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $283,465 $607,200 Not Implemented
SD0436 # 09 Y:2011 09 2011 INSTALL SKYLIGHTS $6,479 $14,200 Not Implemented
SD0436 # 10 Y:2011 10 2011 UPGRADE OBSOLETE EQUIPMENT $20,930 $61,200 Not Implemented
SU0312 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,080 $0 Implemented
SU0312 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,162 $0 Not Implemented
SU0312 # 03 Y:2011 03 2011 DISCONNECT BALLASTS $1,584 $0 Implemented
SU0312 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,822 $177 Not Implemented
SU0312 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $588 $283 Implemented
SU0312 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $175 Implemented
SU0312 # 07 Y:2011 07 2011 REDUCE VENTILATION AIR $13,505 $13,112 Implemented
SU0312 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $308 $450 Not Implemented
SU0312 # 09 Y:2011 09 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,778 $12,185 Not Implemented
SU0312 # 10 Y:2011 10 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $474 $880 Implemented
SU0312 # 11 Y:2011 11 2011 OPTIMIZE PLANT POWER FACTOR $1,695 $15,783 Not Implemented
SU0312 # 12 Y:2011 12 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $276 $4,481 Implemented
OR0571 # 01 Y:2011 01 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,717 $1,120 Not Implemented
OR0571 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $13,809 $52,890 Implemented
OR0571 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,616 $2,200 Implemented
OR0571 # 04 Y:2011 04 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,906 $7,000 Implemented