IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0493 # 11 Y:2013 11 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,410 $15,000 Not Implemented
NC0493 # 12 Y:2013 12 2013 TREAT AND REUSE RINSE WATERS $28,586 $90,000 Not Implemented
NC0493 # 13 Y:2013 13 2013 CONDENSE OPERATION INTO ONE BUILDING $21,473 $10,000 Implemented
TT0112 # 01 Y:2013 01 2013 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $4,915 $4,690 Not Implemented
TT0112 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,630 $2,600 Implemented
TT0112 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $145 $700 Implemented
TT0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,571 $25,960 Implemented
TT0112 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,801 $5,122 Implemented
TT0112 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54 $394 Implemented
TT0112 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,345 $15,200 Not Implemented
BS0020 # 01 Y:2013 01 2013 REDESIGN PROCESS $15,024 $15,359 Not Implemented
BS0020 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $18,318 $19,262 Implemented
BS0020 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,893 $71,307 Implemented
BS0020 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,831 $15,600 Implemented
BS0020 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $9,887 $5,300 Implemented
BS0020 # 06 Y:2013 06 2013 COVER OPEN TANKS $3,845 $6,050 Not Implemented
TT0115 # 01 Y:2013 01 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,000 $50,000 Implemented
TT0115 # 02 Y:2013 02 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,000 $50,000 Implemented
TT0115 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,000 $50,000 Not Implemented
TT0115 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $32,990 $129,250 Not Implemented
TT0115 # 05 Y:2013 05 2013 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $146,360 $450,000 Not Implemented
TT0115 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,000 $4,000 Not Implemented
TT0115 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,635 $2,500 Not Implemented
TT0115 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,984 $20,000 Not Implemented
TT0115 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,635 $20,000 Not Implemented