Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158,585
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0290 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,044 | $2,360 | Implemented |
KU0290 # 02 Y:1989 | 02 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,341 | $2,800 | Not Implemented |
KU0290 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,211 | $0 | Implemented |
KU0290 # 04 Y:1989 | 04 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,337 | $4,000 | Not Implemented |
KU0290 # 05 Y:1989 | 05 | 1989 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $20,380 | $12,500 | Not Implemented |
KU0290 # 06 Y:1989 | 06 | 1989 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $4,390 | $0 | Not Implemented |
KU0290 # 07 Y:1989 | 07 | 1989 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $16,667 | $0 | Implemented |
KU0290 # 08 Y:1989 | 08 | 1989 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,513 | $4,000 | Implemented |
KU0291 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $394 | $261 | Not Implemented |
KU0291 # 02 Y:1989 | 02 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $1,945 | $1,800 | Not Implemented |
KU0291 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $669 | $0 | Implemented |
KU0291 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $82 | $117 | Implemented |
KU0291 # 05 Y:1989 | 05 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $500 | $0 | Implemented |
KU0291 # 06 Y:1989 | 06 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $242 | $350 | Not Implemented |
KU0291 # 07 Y:1989 | 07 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $886 | $150 | Implemented |
KU0291 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $295 | $650 | Not Implemented |
KU0292 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $10,146 | $800 | Implemented |
KU0292 # 02 Y:1989 | 02 | 1989 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $751 | $700 | Not Implemented |
KU0292 # 03 Y:1989 | 03 | 1989 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $591 | $1,350 | Not Implemented |
KU0292 # 04 Y:1989 | 04 | 1989 | INSTALL SET-BACK TIMERS | $3,496 | $1,000 | Implemented |
KU0292 # 05 Y:1989 | 05 | 1989 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $167 | $120 | Implemented |
KU0292 # 06 Y:1989 | 06 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,284 | $3,144 | Not Implemented |
MA0155 # 01 Y:1989 | 01 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,473 | $0 | Implemented |
MA0155 # 02 Y:1989 | 02 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,248 | $11,775 | Implemented |
MA0155 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,948 | $0 | Implemented |