IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,577

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0281 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $200 Not Implemented
KU0281 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $993 $0 Implemented
RU0057 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,747 $1,539 Not Implemented
RU0057 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,269 $0 Not Implemented
RU0057 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $594 Not Implemented
RU0057 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $387 $2,250 Not Implemented
RU0057 # 05 Y:1989 05 1989 IMPROVE LUBRICATION PRACTICES $379 $800 Not Implemented
RU0057 # 06 Y:1989 06 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $807 $0 Not Implemented
RU0057 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,372 $0 Not Implemented
RU0058 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,613 $446 Not Implemented
RU0058 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,807 $0 Not Implemented
RU0058 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,950 $2,500 Not Implemented
RU0058 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,672 $594 Not Implemented
RU0058 # 05 Y:1989 05 1989 AIR CONDITION ONLY SPACE NECESSARY $2,996 $7,200 Not Implemented
RU0058 # 06 Y:1989 06 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,605 $11,500 Not Implemented
OR0053 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $975 $300 Not Implemented
OR0053 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $499 $180 Implemented
OR0053 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,482 $3,000 Implemented
OR0053 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,237 $2,200 Not Implemented
OR0053 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65 $80 Not Implemented
OR0053 # 06 Y:1989 06 1989 OPTIMIZE PLANT POWER FACTOR $6,477 $13,650 Implemented
OK0281 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $89 Implemented
OK0281 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $123 $240 Implemented
OK0281 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,427 $1,500 Implemented
OK0281 # 04 Y:1989 04 1989 REPAIR AND ELIMINATE STEAM LEAKS $26,441 $5,000 Implemented