IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0053 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,482 $3,000 Implemented
OR0053 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,237 $2,200 Not Implemented
OR0053 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65 $80 Not Implemented
OR0053 # 06 Y:1989 06 1989 OPTIMIZE PLANT POWER FACTOR $6,477 $13,650 Implemented
OK0281 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $89 Implemented
OK0281 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $123 $240 Implemented
OK0281 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,427 $1,500 Implemented
OK0281 # 04 Y:1989 04 1989 REPAIR AND ELIMINATE STEAM LEAKS $26,441 $5,000 Implemented
OK0281 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $190 $448 Implemented
OK0281 # 06 Y:1989 06 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,803 $3,680 Implemented
OK0282 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $616 Implemented
OK0282 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,240 $15,500 Implemented
OK0282 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $505 $622 Not Implemented
OK0282 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,924 $1,809 Implemented
OK0282 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,638 $0 Implemented
OK0282 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $894 $215 Implemented
OK0282 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $616 $0 Implemented
OK0282 # 08 Y:1989 08 1989 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $9,879 $15,700 Not Implemented
OK0282 # 09 Y:1989 09 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,664 $23,469 Not Implemented
OK0283 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $24,830 $4,924 Implemented
OK0283 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,286 $0 Implemented
OK0283 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,433 $1,256 Implemented
OK0283 # 04 Y:1989 04 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,508 $475 Not Implemented
OK0283 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $255 Implemented
OK0283 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $264 $84 Not Implemented