IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0521 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,356 $0 Implemented
UF0521 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,160 $1,149 Implemented
UF0521 # 09 Y:2018 09 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $39,645 $66,000 Implemented
UF0521 # 10 Y:2018 10 2018 MAKE A NEW BY-PRODUCT $243,164 $58,810 Implemented
MI0343 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $236,442 $800,000 Implemented
MI0343 # 02 Y:2018 02 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $37,140 $43,838 Not Implemented
MI0343 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,079 $2,030 Implemented
MI0343 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $30,500 $3,280 Implemented
MI0343 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,400 $71,328 Implemented
MI0343 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,044 $2,973 Not Implemented
MI0343 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,421 $1,005 Not Implemented
MI0343 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $7,675 Implemented
MI0343 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,896 $6,486 Implemented
UF0519 # 01 Y:2018 01 2018 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $27,363 $868 Implemented
UF0519 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $17,618 $30,000 Not Implemented
UF0519 # 03 Y:2018 03 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,657 $25,600 Not Implemented
UF0519 # 04 Y:2018 04 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,569 $45,225 Implemented
UF0519 # 05 Y:2018 05 2018 ISOLATE HOT OR COLD EQUIPMENT $6,694 $2,710 Not Implemented
UF0519 # 06 Y:2018 06 2018 UPGRADE CONTROLS ON COMPRESSORS $5,422 $25,600 Not Implemented
UF0519 # 07 Y:2018 07 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,271 $25,600 Not Implemented
UF0519 # 08 Y:2018 08 2018 INSTALL COMMON HEADER ON COMPRESSORS $2,514 $3,216 Not Implemented
UF0519 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,687 $1,850 Implemented
UF0519 # 10 Y:2018 10 2018 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,226 $5,454 Not Implemented
UF0520 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $219,545 $970,000 Not Implemented
UF0520 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,699 $15,000 Implemented