IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0571 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $989 $2,400 Not Implemented
OR0571 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,292 $44,400 Implemented
OR0571 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,940 $12,340 Not Implemented
OR0571 # 08 Y:2011 08 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $285,000 $626,000 Not Implemented
WV0429 # 01 Y:2011 01 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $43,406 $443,960 Not Implemented
WV0429 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,142 $20,962 Not Implemented
WV0429 # 03 Y:2011 03 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,356 $22,155 Not Implemented
WV0429 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,566 $38,070 Not Implemented
WV0429 # 05 Y:2011 05 2011 USE AUTOMATIC CLEANING EQUIPMENT $8,708 $53,000 Not Implemented
WV0429 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,791 $547 Implemented
WV0429 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,932 $3,252 Implemented
WV0429 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,606 $7,343 Implemented
WV0429 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $2,747 $444 Not Implemented
WV0429 # 10 Y:2011 10 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $904 $1,224 Not Implemented
WV0429 # 11 Y:2011 11 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $616 $3,934 Not Implemented
WV0429 # 12 Y:2011 12 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $562 $256 Implemented
WV0429 # 13 Y:2011 13 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $438 $3,900 Implemented
UA0063 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,438 $23,295 Implemented
UA0063 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,938 $1,003 Implemented
UA0063 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,580 $100 Not Implemented
UA0063 # 04 Y:2011 04 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $28,528 $3,584 Implemented
UA0063 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,417 $1,000 Implemented
UA0063 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,363 $3,900 Implemented
UA0063 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $524 $202 Not Implemented
UA0063 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $35,465 $27,200 Implemented