IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0334 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,564 $3,102 Implemented
MI0334 # 08 Y:2018 08 2018 REDUCE DELIVERY SCHEDULES $1,454 $2,490 Implemented
MI0334 # 09 Y:2018 09 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $816 $1,980 Not Implemented
MI0334 # 10 Y:2018 10 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $803 $1,560 Implemented
MI0334 # 11 Y:2018 11 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $592 $1,973 Implemented
OR0702 # 01 Y:2018 01 2018 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $20,800 $7,140 Not Implemented
OR0702 # 02 Y:2018 02 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,088 $660 Not Implemented
OR0702 # 03 Y:2018 03 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,409 $1,005 Not Implemented
OR0702 # 04 Y:2018 04 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,065 $5,807 Not Implemented
OR0701 # 01 Y:2018 01 2018 INSTALL SYSTEM TO COLLECT SCRAP $35,903 $29,900 Not Implemented
OR0701 # 02 Y:2018 02 2018 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,929 $8,549 Not Implemented
OR0701 # 03 Y:2018 03 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,954 $11,773 Not Implemented
OR0701 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,441 $4,175 Not Implemented
IC0204 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $71,958 $100,000 Implemented
IC0204 # 02 Y:2018 02 2018 ADJUST PH FOR NEUTRALIZATION $132,488 $180,000 Implemented
IC0204 # 03 Y:2018 03 2018 REPLACE BOILER $97,199 $211,342 Implemented
IC0204 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $71,357 $8,712 Implemented
IC0204 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $21,223 $0 Implemented
IC0204 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $36,108 $187,206 Implemented
IP0102 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,210 $0 Not Implemented
IP0102 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $136 $0 Not Implemented
IP0102 # 03 Y:2018 03 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $10 $0 Not Implemented
IP0102 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $759 $629 Not Implemented
IP0102 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,705 $10,744 Not Implemented
IP0102 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,737 $35,615 Not Implemented