IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0271 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,360 $0 Implemented
UD0271 # 03 Y:1989 03 1989 REDESIGN PROCESS $62,230 $10,000 Implemented
UD0271 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,591 $500 Implemented
UD0271 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,761 $27,100 Implemented
UD0272 # 01 Y:1989 01 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,742 $75,000 Not Implemented
UD0272 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $2,010 $0 Implemented
UD0272 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,495 $278 Implemented
UD0268 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,113 $0 Implemented
UD0268 # 02 Y:1988 02 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,128 $3,448 Implemented
UD0268 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,096 $3,000 Implemented
UD0268 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $281 $0 Implemented
UD0269 # 01 Y:1988 01 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $227 $0 Implemented
UD0269 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $633 Implemented
UD0269 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $242 $500 Implemented
UD0269 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,782 $5,000 Implemented
UD0270 # 01 Y:1988 01 1988 REDESIGN PROCESS $3,796 $1,000 Implemented
UD0270 # 02 Y:1988 02 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,575 $1,000 Implemented
AT0113 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,641 $10,000 Implemented
AT0113 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,031 $3,096 Implemented
AT0113 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $181 $260 Implemented
AT0113 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $419 $0 Implemented
AT0113 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,565 $200 Implemented
AT0113 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $300 Implemented
AT0114 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $9,606 $780 Not Implemented
AT0114 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,779 $16,500 Implemented