IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,089

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0059 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,374 $0 Implemented
WI0059 # 08 Y:1989 08 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $929 $1,000 Not Implemented
WI0059 # 09 Y:1989 09 1989 INSTALL SET-BACK TIMERS $449 $400 Not Implemented
WI0059 # 10 Y:1989 10 1989 INSULATE BARE EQUIPMENT $258 $175 Not Implemented
WI0058 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $20,838 $3,000 Implemented
WI0058 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,185 $20,000 Not Implemented
WI0058 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $7,226 $0 Implemented
WI0058 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,645 $4,200 Not Implemented
WI0058 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,077 $500 Implemented
WI0058 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,523 $0 Implemented
WI0058 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,585 $1,500 Implemented
WI0058 # 08 Y:1989 08 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $1,395 $800 Not Implemented
WI0058 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $668 $0 Implemented
WI0058 # 10 Y:1989 10 1989 INSTALL STORM WINDOWS AND DOORS $865 $1,334 Not Implemented
WI0058 # 11 Y:1989 11 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $639 $0 Not Implemented
WI0059 # 01 Y:1989 01 1989 IMPROVE LUBRICATION PRACTICES $12,658 $0 Not Implemented
AM0067 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,911 $6,400 Not Implemented
AM0067 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $4,380 $800 Implemented
AM0067 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $3,860 $0 Implemented
AM0067 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,932 $175 Implemented
AM0067 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $800 Not Implemented
AM0067 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154 $91 Not Implemented
AM0067 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $285 $83 Not Implemented
AM0067 # 09 Y:1989 09 1989 CHECK FOR ACCURACY OF UTILITY / POWER METERS $94 $500 Not Implemented
AM0068 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,430 $24,600 Implemented