Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0785 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $563 | $0 | Implemented |
OK0782 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $852 | $354 | Implemented |
OK0782 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,732 | $3,742 | Not Implemented |
OK0782 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,733 | $0 | Implemented |
OK0782 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,005 | $7,542 | Not Implemented |
OK0782 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $11,120 | Not Implemented |
OK0782 # 06 Y:2009 | 06 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $804 | $4,800 | Not Implemented |
OK0782 # 07 Y:2009 | 07 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,815 | $820 | Implemented |
OK0782 # 08 Y:2009 | 08 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $700 | $1,825 | Implemented |
OK0779 # 01 Y:2009 | 01 | 2009 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,513 | $900,000 | Not Implemented |
OK0779 # 02 Y:2009 | 02 | 2009 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $122,608 | $160,000 | Not Implemented |
OK0779 # 03 Y:2009 | 03 | 2009 | USE POWER DURING OFF-PEAK PERIODS | $30,940 | $0 | Not Implemented |
OK0779 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,076 | $6,396 | Not Implemented |
OK0779 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,634 | $26,750 | Implemented |
OK0779 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,089 | $14,467 | Implemented |
OK0779 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,569 | $0 | Implemented |
OK0779 # 08 Y:2009 | 08 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,812 | $1,944 | Implemented |
OK0779 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $7,677 | $989 | Not Implemented |
OK0778 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $171,482 | $47,731 | Implemented |
OK0778 # 02 Y:2009 | 02 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,464 | $1,266 | Implemented |
OK0778 # 03 Y:2009 | 03 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $13,933 | $525 | Implemented |
OK0778 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,111 | $5,417 | Implemented |
OK0778 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $412 | $0 | Implemented |
OK0777 # 01 Y:2009 | 01 | 2009 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $164,328 | $490,000 | Implemented |
OK0777 # 02 Y:2009 | 02 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $26,234 | $0 | Implemented |