IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0392 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $609 $1,733 Not Implemented
LE0392 # 13 Y:2015 13 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,472 $70,000 Not Implemented
LE0392 # 14 Y:2015 14 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,425 $10,000 Not Implemented
LE0392 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,693 $13,275 Not Implemented
LE0393 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,445 $25 Not Implemented
LE0393 # 02 Y:2015 02 2015 INSTALL TIMERS AND/OR THERMOSTATS $4,240 $1,125 Not Implemented
LE0393 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,825 $1,000 Not Implemented
LE0393 # 04 Y:2015 04 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $130 $75 Not Implemented
LE0393 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $365 Not Implemented
LE0393 # 06 Y:2015 06 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,198 $3,052 Not Implemented
LE0393 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $15,747 $40,880 Not Implemented
LE0393 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,275 $4,018 Not Implemented
LE0393 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,261 $11,400 Not Implemented
LE0393 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $1,313 Not Implemented
LE0393 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66 $289 Not Implemented
WV0498 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,712 $100,740 Not Implemented
WV0498 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $45,555 $130,520 Not Implemented
WV0498 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,058 $1,700 Implemented
WV0498 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,550 $1,000 Implemented
WV0498 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,891 $599 Implemented
WV0498 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $6,111 $6,377 Implemented
WV0498 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $5,821 $864 Implemented
WV0498 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,141 $19,874 Implemented
WV0498 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,537 $0 Not Implemented
WV0498 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $170 $457 Not Implemented