IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0037 # 12 Y:2013 12 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $687 $900 Not Implemented
WM0037 # 13 Y:2013 13 2013 MODIFY WORKLOAD $21,420 $3,781 Not Implemented
WM0036 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $288 $0 Implemented
WM0036 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $396 $200 Not Implemented
WM0036 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $783 $4,255 Not Implemented
WM0036 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,540 $5,355 Not Implemented
WM0036 # 05 Y:2013 05 2013 IMPROVE SPACE COMFORT CONDITIONING $3,641 $595 Not Implemented
WM0036 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,574 $780 Not Implemented
WM0036 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,340 $1,900 Implemented
WM0035 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,932 $1,000 Implemented
WM0035 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $771 $0 Not Implemented
WM0035 # 03 Y:2013 03 2013 REPAIR OR REPLACE STEAM TRAPS $7,478 $1,500 Implemented
WM0035 # 04 Y:2013 04 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,425 $2,270 Implemented
WM0035 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $1,145 $200 Not Implemented
WM0035 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,953 $0 Implemented
WM0035 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $594 $0 Implemented
WM0034 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,332 $276 Not Implemented
WM0034 # 02 Y:2013 02 2013 COMBINE UTILITY METERS $2,182 $5,000 Not Implemented
WM0034 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $351 $469 Not Implemented
WM0034 # 04 Y:2013 04 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $367 $1,138 Not Implemented
WM0034 # 05 Y:2013 05 2013 ELIMINATE A BY-PRODUCT $954 $2,210 Not Implemented
WM0034 # 06 Y:2013 06 2013 IMPROVE SPACE COMFORT CONDITIONING $3,125 $550 Implemented
WM0033 # 01 Y:2013 01 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,320 $57,920 Not Implemented
WM0033 # 02 Y:2013 02 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,046 $0 Not Implemented
WM0033 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $617 $0 Not Implemented