IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0508 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $90 Implemented
CO0508 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,230 $7,000 Implemented
CO0508 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,570 $23,500 Not Implemented
CO0508 # 04 Y:2002 04 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $31,960 $1,620 Implemented
CO0508 # 05 Y:2002 05 2002 $115,000 $100,000 Not Implemented
UM0221 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $2,000 Not Implemented
UM0221 # 08 Y:2002 08 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,075 $3,000 Not Implemented
UM0221 # 09 Y:2002 09 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,340 $8,500 Not Implemented
UM0221 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,125 $2,000 Not Implemented
WI0427 # 01 Y:2002 01 2002 $66,300 $1,000 Not Implemented
WI0427 # 02 Y:2002 02 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,439 $400 Implemented
WI0427 # 03 Y:2002 03 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,046 $1,000 Not Implemented
WI0427 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $3,136 Not Implemented
WI0427 # 05 Y:2002 05 2002 REDUCE VENTILATION AIR $522 $500 Not Implemented
WI0427 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $391 $740 Implemented
WI0427 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $120 $0 Not Implemented
IA0296 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,888 $436 Implemented
IA0296 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,082 $586 Not Implemented
IA0296 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $5,317 $1,800 Implemented
IA0296 # 04 Y:2002 04 2002 REPAIR OR REPLACE STEAM TRAPS $5,180 $1,320 Implemented
IA0296 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $341 $466 Not Implemented
IA0296 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $83,966 $138,450 Not Implemented
IA0296 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,371 $0 Not Implemented
IA0296 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,948 $6,025 Not Implemented
MS0212 # 01 Y:2002 01 2002 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,698 $1,707 Not Implemented