Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0805 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,150 | $370 | Implemented |
AM0805 # 08 Y:2020 | 08 | 2020 | USE SYNTHETIC LUBRICANT | $1,090 | $200 | Not Implemented |
AM0805 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,070 | $820 | Implemented |
AM0805 # 10 Y:2020 | 10 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,210 | $31,000 | Implemented |
AM0805 # 11 Y:2020 | 11 | 2020 | OPTIMIZE PLANT POWER FACTOR | $20,570 | $41,165 | Not Implemented |
AM0805 # 12 Y:2020 | 12 | 2020 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,920 | $7,400 | Not Implemented |
CW0113 # 01 Y:2020 | 01 | 2020 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,565 | $1,858 | Implemented |
CW0113 # 02 Y:2020 | 02 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $104,454 | $200,550 | Not Implemented |
CW0113 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $941 | $105 | Implemented |
CW0113 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $810 | Not Implemented |
CW0113 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $1,600 | Implemented |
CW0113 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $13,673 | $2,250 | Not Implemented |
CW0113 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,683 | $10,280 | Implemented |
CW0113 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $3,092 | $1,969 | Not Implemented |
IC0239 # 01 Y:2020 | 01 | 2020 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $11,777 | $0 | Not Implemented |
IC0239 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,780 | $0 | Not Implemented |
IC0239 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,851 | $5,000 | Not Implemented |
IC0239 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,411 | $4,168 | Not Implemented |
IC0239 # 05 Y:2020 | 05 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $11,954 | $26,400 | Not Implemented |
IC0239 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,041 | $3,075 | Not Implemented |
MZ0289 # 01 Y:2020 | 01 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,779 | $20,692 | Not Implemented |
MZ0289 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,636 | $1,117 | Implemented |
MZ0289 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM THICKNESS INSULATION | $3,128 | $4,056 | Implemented |
MZ0289 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,651 | $3,250 | Not Implemented |
MZ0289 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $2,151 | $7,144 | Implemented |