IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,510

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0402 # 01 Y:1990 01 1990 KEEP LAMPS AND REFLECTORS CLEAN $4,123 $11,116 Implemented
TN0402 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,474 $4,140 Implemented
TN0402 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,428 $960 Implemented
TN0402 # 04 Y:1990 04 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,440 $0 Implemented
TN0402 # 05 Y:1990 05 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $925 $0 Implemented
TN0402 # 06 Y:1990 06 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $880 $500 Implemented
TN0402 # 07 Y:1990 07 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $780 $660 Not Implemented
TN0402 # 08 Y:1990 08 1990 DISCONNECT BALLASTS $96 $0 Implemented
TN0402 # 09 Y:1990 09 1990 IMPROVE LUBRICATION PRACTICES $57 $30 Not Implemented
UD0316 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,000 $0 Not Implemented
UD0316 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,890 $0 Not Implemented
UD0316 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,175 $0 Not Implemented
UD0316 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,611 $0 Not Implemented
UD0316 # 05 Y:1990 05 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,186 $10,000 Not Implemented
UD0317 # 01 Y:1990 01 1990 MINIMIZE WATER USAGE $4,564 $4,200 Implemented
UD0317 # 02 Y:1990 02 1990 REDESIGN PROCESS $27,328 $30,000 Not Implemented
UD0317 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,080 $70,000 Not Implemented
RU0088 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,114 $0 Not Implemented
RU0088 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,045 $68 Not Implemented
RU0088 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $851 $650 Implemented
RU0088 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,127 $0 Not Implemented
RU0088 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $16,127 $800 Not Implemented
RU0088 # 06 Y:1990 06 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,585 $50,000 Not Implemented
RU0088 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,543 $0 Not Implemented
RU0088 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $265 $156 Not Implemented