IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163,717

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0074 # 03 Y:1989 03 1989 OPTIMIZE PLANT POWER FACTOR $498 $1,125 Implemented
OR0074 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $250 Implemented
OR0075 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $794 $500 Implemented
OR0075 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $147 $117 Not Implemented
OR0075 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $228 $213 Implemented
OR0075 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $78 $94 Implemented
OR0075 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $925 $1,340 Not Implemented
OR0075 # 06 Y:1989 06 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $833 $1,175 Implemented
OR0075 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $244 Implemented
RU0075 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,443 $650 Not Implemented
RU0075 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,281 $0 Implemented
RU0075 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $780 $800 Not Implemented
RU0075 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $2,338 $218 Not Implemented
RU0075 # 05 Y:1989 05 1989 INSTALL SET-BACK TIMERS $1,089 $80 Not Implemented
RU0075 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,572 $3,800 Not Implemented
RU0075 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,528 $6,660 Not Implemented
CO0170 # 01 Y:1989 01 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,370 $3,200 Not Implemented
CO0170 # 02 Y:1989 02 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $660 $500 Not Implemented
CO0170 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,760 $1,000 Implemented
CO0170 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,273 $3,850 Implemented
CO0170 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $776 Implemented
CO0170 # 06 Y:1989 06 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,670 $6,111 Not Implemented
CO0170 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,460 $1,000 Implemented
CO0170 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $750 Implemented
CO0170 # 09 Y:1989 09 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $440 $650 Not Implemented