Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,717
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0074 # 03 Y:1989 | 03 | 1989 | OPTIMIZE PLANT POWER FACTOR | $498 | $1,125 | Implemented |
OR0074 # 04 Y:1989 | 04 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $200 | $250 | Implemented |
OR0075 # 01 Y:1989 | 01 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $794 | $500 | Implemented |
OR0075 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $147 | $117 | Not Implemented |
OR0075 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $228 | $213 | Implemented |
OR0075 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $78 | $94 | Implemented |
OR0075 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $925 | $1,340 | Not Implemented |
OR0075 # 06 Y:1989 | 06 | 1989 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $833 | $1,175 | Implemented |
OR0075 # 07 Y:1989 | 07 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $131 | $244 | Implemented |
RU0075 # 01 Y:1989 | 01 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,443 | $650 | Not Implemented |
RU0075 # 02 Y:1989 | 02 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,281 | $0 | Implemented |
RU0075 # 03 Y:1989 | 03 | 1989 | IMPROVE LUBRICATION PRACTICES | $780 | $800 | Not Implemented |
RU0075 # 04 Y:1989 | 04 | 1989 | INSULATE BARE EQUIPMENT | $2,338 | $218 | Not Implemented |
RU0075 # 05 Y:1989 | 05 | 1989 | INSTALL SET-BACK TIMERS | $1,089 | $80 | Not Implemented |
RU0075 # 06 Y:1989 | 06 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,572 | $3,800 | Not Implemented |
RU0075 # 07 Y:1989 | 07 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,528 | $6,660 | Not Implemented |
CO0170 # 01 Y:1989 | 01 | 1989 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,370 | $3,200 | Not Implemented |
CO0170 # 02 Y:1989 | 02 | 1989 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $660 | $500 | Not Implemented |
CO0170 # 03 Y:1989 | 03 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,760 | $1,000 | Implemented |
CO0170 # 04 Y:1989 | 04 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,273 | $3,850 | Implemented |
CO0170 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $900 | $776 | Implemented |
CO0170 # 06 Y:1989 | 06 | 1989 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,670 | $6,111 | Not Implemented |
CO0170 # 07 Y:1989 | 07 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,460 | $1,000 | Implemented |
CO0170 # 08 Y:1989 | 08 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $245 | $750 | Implemented |
CO0170 # 09 Y:1989 | 09 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $440 | $650 | Not Implemented |