Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,693
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0074 # 05 Y:1989 | 05 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,419 | $500 | Not Implemented |
RU0074 # 06 Y:1989 | 06 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,443 | $4,860 | Not Implemented |
RU0074 # 08 Y:1989 | 08 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $3,347 | $2,390 | Not Implemented |
RU0071 # 01 Y:1989 | 01 | 1989 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,813 | $0 | Not Implemented |
RU0071 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $360 | $295 | Implemented |
RU0071 # 03 Y:1989 | 03 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $738 | $0 | Not Implemented |
RU0071 # 04 Y:1989 | 04 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $117 | Not Implemented |
RU0071 # 05 Y:1989 | 05 | 1989 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,352 | $50 | Implemented |
RU0071 # 06 Y:1989 | 06 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,906 | $6,800 | Not Implemented |
RU0071 # 07 Y:1989 | 07 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,674 | $2,700 | Not Implemented |
RU0071 # 08 Y:1989 | 08 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,772 | $500 | Implemented |
RU0073 # 01 Y:1989 | 01 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,457 | $450 | Not Implemented |
RU0073 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,131 | $325 | Implemented |
RU0073 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,227 | $2,028 | Implemented |
RU0073 # 04 Y:1989 | 04 | 1989 | AIR CONDITION ONLY SPACE NECESSARY | $846 | $0 | Not Implemented |
RU0073 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,635 | $645 | Implemented |
RU0073 # 06 Y:1989 | 06 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $278 | $0 | Implemented |
RU0073 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,530 | $44,000 | Not Implemented |
OK0297 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,160 | $5,523 | Not Implemented |
OK0297 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,738 | $1,478 | Implemented |
OK0297 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $233 | $123 | Implemented |
OK0297 # 04 Y:1989 | 04 | 1989 | OPTIMIZE PLANT POWER FACTOR | $1,607 | $2,500 | Not Implemented |
OK0297 # 05 Y:1989 | 05 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,788 | $0 | Implemented |
OK0297 # 06 Y:1989 | 06 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,017 | $2,289 | Implemented |
OK0298 # 01 Y:1989 | 01 | 1989 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $17,721 | $47,000 | Not Implemented |