IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,580

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0383 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $261 Implemented
TN0384 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,074 $22,940 Implemented
TN0384 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $41,715 $16,000 Implemented
TN0384 # 03 Y:1989 03 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,266 $550 Implemented
TN0384 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $2,833 $826 Implemented
TN0384 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,972 $750 Implemented
TN0384 # 06 Y:1989 06 1989 KEEP LAMPS AND REFLECTORS CLEAN $13,017 $9,388 Implemented
TN0384 # 07 Y:1989 07 1989 IMPROVE LUBRICATION PRACTICES $3,004 $0 Not Implemented
TN0384 # 08 Y:1989 08 1989 INSTALL SET-BACK TIMERS $865 $1,300 Implemented
TN0384 # 09 Y:1989 09 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $87 $180 Implemented
TN0386 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,995 $9,500 Implemented
TN0386 # 02 Y:1989 02 1989 REDESIGN PROCESS $16,823 $3,380 Not Implemented
TN0386 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,664 $0 Implemented
TN0386 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $3,860 Implemented
TN0386 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,143 $0 Not Implemented
TN0386 # 06 Y:1989 06 1989 USE OPTIMUM THICKNESS INSULATION $851 $735 Not Implemented
TN0386 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $659 $500 Implemented
MA0162 # 01 Y:1989 01 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $936 $75 Implemented
MA0162 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $665 $50 Not Implemented
MA0162 # 03 Y:1989 03 1989 INSTALL EFFICIENT RECTIFIERS $14,209 $8,500 Not Implemented
MA0162 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,765 $400 Not Implemented
MA0162 # 05 Y:1989 05 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $636 $1,041 Not Implemented
MA0162 # 06 Y:1989 06 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,259 $14,920 Not Implemented
MA0162 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $712 $150 Not Implemented
MA0163 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $285 Implemented