IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,734

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0320 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,400 $5,170 Implemented
GT0320 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $520 Implemented
GT0320 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $155 $310 Implemented
CO0091 # 01 Y:1987 01 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $743 $800 Implemented
CO0091 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $822 $75 Implemented
CO0091 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $2,651 $175 Implemented
CO0091 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $817 $400 Implemented
CO0091 # 05 Y:1987 05 1987 IMPROVE LUBRICATION PRACTICES $608 $0 Implemented
CO0091 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $399 $676 Implemented
CO0091 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,261 $1,500 Implemented
CO0091 # 08 Y:1987 08 1987 INSTALL TIMERS AND/OR THERMOSTATS $22,175 $1,682 Implemented
CO0091 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,091 $2,000 Implemented
CO0092 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,461 $500 Implemented
CO0092 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,213 $3,000 Implemented
CO0092 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,081 $250 Implemented
CO0092 # 04 Y:1987 04 1987 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,490 $2,000 Implemented
CO0092 # 05 Y:1987 05 1987 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,800 $13,500 Not Implemented
CO0092 # 06 Y:1987 06 1987 REDUCE VENTILATION AIR $300 $36 Implemented
CO0092 # 07 Y:1987 07 1987 INSULATE BARE EQUIPMENT $187 $60 Implemented
CO0092 # 08 Y:1987 08 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,609 $10,000 Implemented
CO0092 # 09 Y:1987 09 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $149 $525 Implemented
CO0092 # 10 Y:1987 10 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,942 $4,800 Not Implemented
CO0092 # 11 Y:1987 11 1987 INSTALL TIMERS AND/OR THERMOSTATS $2,841 $474 Implemented
CO0092 # 12 Y:1987 12 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,813 $2,762 Implemented
AT0076 # 06 Y:1987 06 1987 RECOVER WASTE HEAT FROM EQUIPMENT $684 $300 Not Implemented