IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,600

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0306 # 05 Y:1987 05 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $0 Implemented
TN0308 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,834 $0 Not Implemented
TN0308 # 02 Y:1987 02 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,468 $16,872 Not Implemented
TN0308 # 03 Y:1987 03 1987 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $2,858 $3,500 Not Implemented
TN0308 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $603 $1,440 Implemented
TN0308 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,709 $165 Implemented
TN0308 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $470 Implemented
TN0308 # 07 Y:1987 07 1987 OPTIMIZE PLANT POWER FACTOR $1,764 $6,800 Implemented
TN0309 # 01 Y:1987 01 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,793 $2,480 Implemented
TN0309 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $165 Implemented
TN0309 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $2,495 $0 Not Implemented
TN0309 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $470 Implemented
TN0309 # 05 Y:1987 05 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $542 $300 Implemented
WI0002 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $11,988 $3,268 Implemented
WI0002 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,806 $0 Implemented
WI0002 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $3,998 Implemented
WI0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $168 Not Implemented
WI0002 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,543 $3,000 Not Implemented
WI0002 # 06 Y:1987 06 1987 OPTIMIZE PLANT POWER FACTOR $5,773 $12,000 Implemented
UD0234 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,497 $15,000 Implemented
UD0234 # 02 Y:1987 02 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,021 $0 Implemented
UD0234 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $60 Implemented
UD0235 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,496 $500 Implemented
UD0235 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,497 $0 Implemented
UD0235 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,823 $2,986 Not Implemented