IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

165,667

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0312 # 06 Y:1990 06 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,884 $0 Implemented
UD0312 # 07 Y:1990 07 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,775 $5,000 Not Implemented
UD0312 # 08 Y:1990 08 1990 INSTALL TIMERS AND/OR THERMOSTATS $21,868 $12,000 Not Implemented
UD0312 # 09 Y:1990 09 1990 REPAIR AND ELIMINATE STEAM LEAKS $24,995 $0 Implemented
UD0312 # 10 Y:1990 10 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,168 $100,000 Not Implemented
CO0178 # 08 Y:1990 08 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $320 $300 Implemented
CO0179 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,400 $1,500 Implemented
CO0179 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,400 $500 Implemented
CO0179 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $339 Implemented
CO0179 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $700 Implemented
CO0179 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,480 $350 Implemented
CO0180 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,040 $12,000 Not Implemented
CO0180 # 02 Y:1990 02 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,850 $6,700 Not Implemented
CO0180 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $3,600 $1,500 Implemented
CO0180 # 04 Y:1990 04 1990 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,920 $3,400 Not Implemented
CO0180 # 05 Y:1990 05 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,180 $2,700 Not Implemented
CO0180 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $500 Implemented
CO0180 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $400 Implemented
CO0180 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $128 Implemented
CO0176 # 01 Y:1990 01 1990 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $44,728 $40,000 Implemented
CO0176 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,130 $11,740 Not Implemented
CO0176 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $1,000 Implemented
CO0176 # 04 Y:1990 04 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,390 $500 Not Implemented
CO0176 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,350 $1,800 Implemented
CO0176 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $200 Implemented