IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0231 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $1,070 Implemented
UD0231 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,586 $0 Implemented
UD0232 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,451 $0 Not Implemented
UD0232 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $3,368 $795 Implemented
UD0232 # 03 Y:1987 03 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,586 $10,000 Not Implemented
UD0232 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,488 $1,700 Implemented
UD0232 # 05 Y:1987 05 1987 REDUCE GLAZED AREAS IN BUILDINGS $3,241 $8,860 Not Implemented
UD0233 # 01 Y:1987 01 1987 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,942 $3,000 Implemented
UD0233 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,036 $0 Implemented
UD0233 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $450 $0 Implemented
RU0001 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,628 $376 Implemented
RU0001 # 02 Y:1987 02 1987 COVER OPEN TANKS $3,290 $200 Not Implemented
RU0001 # 03 Y:1987 03 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $822 $31 Implemented
RU0001 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,104 $0 Implemented
RU0001 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,551 $0 Implemented
RU0002 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $22,514 $0 Implemented
RU0002 # 02 Y:1987 02 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,280 $32,000 Implemented
RU0002 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,433 $5,670 Implemented
RU0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $178 Implemented
RU0002 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $9,437 $6,204 Not Implemented
RU0002 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,751 $0 Implemented
AT0071 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,371 $4,570 Implemented
AT0071 # 02 Y:1987 02 1987 CLOSE OFF UNNEEDED STEAM LINES $162 $50 Implemented
AT0071 # 03 Y:1987 03 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $377 $500 Implemented
AT0071 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $168 $0 Implemented