IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,803

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0021 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $109 $0 Not Implemented
RU0021 # 04 Y:1988 04 1988 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $956 $800 Implemented
RU0021 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,480 $2,151 Not Implemented
RU0021 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,095 $400 Implemented
OR0019 # 01 Y:1988 01 1988 OPERATE BOILERS ON HIGH FIRE SETTING $8,014 $0 Implemented
OR0019 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,700 $300 Implemented
OR0019 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $1,572 $276 Implemented
OR0019 # 05 Y:1988 05 1988 INCREASE AMOUNT OF CONDENSATE RETURNED $36,523 $9,395 Implemented
OR0019 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $13,283 $5,026 Implemented
OR0019 # 07 Y:1988 07 1988 INSULATE BARE EQUIPMENT $7,722 $7,598 Implemented
OR0019 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $2,604 Implemented
OR0019 # 09 Y:1988 09 1988 OPTIMIZE PLANT POWER FACTOR $2,952 $6,720 Not Implemented
LT0113 # 01 Y:1988 01 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,200 $40,000 Not Implemented
LT0113 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,025 $1,105 Implemented
LT0113 # 03 Y:1988 03 1988 BURN WOOD BY-PRODUCTS FOR HEAT $8,115 $24,400 Not Implemented
MA0116 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,841 $320 Not Implemented
MA0116 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $435 $515 Not Implemented
MA0116 # 03 Y:1988 03 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,585 $0 Not Implemented
MA0116 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,632 $1,450 Not Implemented
MA0116 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,500 $7,500 Not Implemented
AT0097 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,981 $2,213 Not Implemented
AT0097 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,740 $2,305 Not Implemented
AT0097 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,223 $0 Not Implemented
AT0097 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $509 $0 Not Implemented
AT0097 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,707 $0 Not Implemented