IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,405

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0305 # 04 Y:1987 04 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,592 $1,315 Not Implemented
TN0305 # 05 Y:1987 05 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,297 $0 Not Implemented
TN0305 # 06 Y:1987 06 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,034 $348 Implemented
TN0305 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $120 Implemented
TN0300 # 01 Y:1987 01 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $17,707 $6,612 Implemented
TN0300 # 02 Y:1987 02 1987 REPAIR AND ELIMINATE STEAM LEAKS $12,978 $760 Implemented
TN0300 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,734 $0 Implemented
TN0300 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,162 $12,300 Not Implemented
TN0300 # 05 Y:1987 05 1987 USE MINIMUM STEAM OPERATING PRESSURE $3,671 $0 Implemented
TN0300 # 06 Y:1987 06 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,750 $4,240 Implemented
TN0300 # 07 Y:1987 07 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,113 $0 Not Implemented
TN0300 # 08 Y:1987 08 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $731 $107 Implemented
TN0300 # 09 Y:1987 09 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,421 $1,810 Not Implemented
TN0302 # 01 Y:1987 01 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,791 $6,512 Implemented
TN0302 # 02 Y:1987 02 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,877 $0 Implemented
TN0302 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $874 $150 Implemented
TN0302 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $822 $0 Implemented
TN0302 # 05 Y:1987 05 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9 $0 Implemented
TN0302 # 06 Y:1987 06 1987 INSULATE BARE EQUIPMENT $197 $184 Implemented
TN0303 # 01 Y:1987 01 1987 INSTALL SET-BACK TIMERS $11,719 $0 Implemented
TN0303 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $7,037 $1,200 Implemented
TN0303 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $1,769 $1,904 Implemented
TN0303 # 04 Y:1987 04 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,973 $780 Implemented
TN0303 # 05 Y:1987 05 1987 USE MINIMUM STEAM OPERATING PRESSURE $741 $0 Not Implemented
TN0303 # 06 Y:1987 06 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $948 $3,960 Implemented