Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,615
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0297 # 01 Y:2000 | 01 | 2000 | BURN A LESS EXPENSIVE GRADE OF FUEL | $10,802 | $30,000 | n/a |
ME0296 # 13 Y:2000 | 13 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,875 | $965 | Not Implemented |
ME0296 # 12 Y:2000 | 12 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $437,500 | $784,300 | Not Implemented |
ME0296 # 11 Y:2000 | 11 | 2000 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $8,450 | $52,500 | Not Implemented |
ME0296 # 10 Y:2000 | 10 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $212 | $518 | Not Implemented |
ME0296 # 09 Y:2000 | 09 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $375 | $230 | Not Implemented |
ME0296 # 08 Y:2000 | 08 | 2000 | USE PHOTOCELL CONTROLS | $387 | $600 | Not Implemented |
ME0296 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $666 | $1,088 | Not Implemented |
ME0296 # 06 Y:2000 | 06 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $752 | $490 | Not Implemented |
ME0296 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $856 | $890 | Not Implemented |
ME0296 # 04 Y:2000 | 04 | 2000 | PAY UTILITY BILLS ON TIME | $1,617 | $0 | Not Implemented |
ME0296 # 03 Y:2000 | 03 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,070 | $4,700 | Not Implemented |
ME0296 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,377 | $2,124 | Not Implemented |
ME0296 # 01 Y:2000 | 01 | 2000 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $625,184 | $1,387,500 | Not Implemented |
ME0293 # 06 Y:2000 | 06 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $30,516 | $15,070 | Not Implemented |
ME0293 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $200 | Implemented |
ME0293 # 04 Y:2000 | 04 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,183 | $0 | Implemented |
ME0293 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $4,661 | $7,900 | Not Implemented |
ME0293 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,138 | $10,890 | Not Implemented |
ME0293 # 01 Y:2000 | 01 | 2000 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $19,379 | $38,000 | Not Implemented |
ME0292 # 15 Y:2000 | 15 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,500 | $1,550 | Not Implemented |
ME0292 # 14 Y:2000 | 14 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $40 | $0 | Implemented |
ME0292 # 13 Y:2000 | 13 | 2000 | SELL COMBUSTIBLE WASTE | $4,000 | $12,000 | Not Implemented |
ME0292 # 12 Y:2000 | 12 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $8,700 | $9,500 | Not Implemented |
ME0292 # 11 Y:2000 | 11 | 2000 | USE OPTIMUM THICKNESS INSULATION | $34 | $72 | Not Implemented |