IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0297 # 01 Y:2000 01 2000 BURN A LESS EXPENSIVE GRADE OF FUEL $10,802 $30,000 n/a
ME0296 # 13 Y:2000 13 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,875 $965 Not Implemented
ME0296 # 12 Y:2000 12 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $437,500 $784,300 Not Implemented
ME0296 # 11 Y:2000 11 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $8,450 $52,500 Not Implemented
ME0296 # 10 Y:2000 10 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $518 Not Implemented
ME0296 # 09 Y:2000 09 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $375 $230 Not Implemented
ME0296 # 08 Y:2000 08 2000 USE PHOTOCELL CONTROLS $387 $600 Not Implemented
ME0296 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $666 $1,088 Not Implemented
ME0296 # 06 Y:2000 06 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $752 $490 Not Implemented
ME0296 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $856 $890 Not Implemented
ME0296 # 04 Y:2000 04 2000 PAY UTILITY BILLS ON TIME $1,617 $0 Not Implemented
ME0296 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,070 $4,700 Not Implemented
ME0296 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,377 $2,124 Not Implemented
ME0296 # 01 Y:2000 01 2000 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $625,184 $1,387,500 Not Implemented
ME0293 # 06 Y:2000 06 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $30,516 $15,070 Not Implemented
ME0293 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $200 Implemented
ME0293 # 04 Y:2000 04 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,183 $0 Implemented
ME0293 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $4,661 $7,900 Not Implemented
ME0293 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,138 $10,890 Not Implemented
ME0293 # 01 Y:2000 01 2000 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $19,379 $38,000 Not Implemented
ME0292 # 15 Y:2000 15 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,500 $1,550 Not Implemented
ME0292 # 14 Y:2000 14 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $40 $0 Implemented
ME0292 # 13 Y:2000 13 2000 SELL COMBUSTIBLE WASTE $4,000 $12,000 Not Implemented
ME0292 # 12 Y:2000 12 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,700 $9,500 Not Implemented
ME0292 # 11 Y:2000 11 2000 USE OPTIMUM THICKNESS INSULATION $34 $72 Not Implemented