IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0293 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,199 $0 Implemented
TT0293 # 07 Y:2023 07 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $923 $1,600 Implemented
TT0293 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $736 $170 Implemented
TT0293 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $630 $2,000 Implemented
MS0409 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44,271 $0 n/a
MS0409 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $96 $582 n/a
MS0409 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,770 $0 n/a
MS0408 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $357 $1,634 n/a
MS0408 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $70,508 $548,100 n/a
MS0408 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,817 $0 n/a
MS0408 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,092 $12,955 n/a
MS0408 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,424 $0 n/a
MS0407 # 01 Y:2022 01 2022 USE OPTIMUM THICKNESS INSULATION $276 $1,511 n/a
MS0407 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $35,678 $304,500 n/a
MS0407 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $293 $1,944 n/a
MS0406 # 01 Y:2022 01 2022 REPLACE BOILER $17,347 $165,000 Not Implemented
MS0406 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $0 Not Implemented
MS0406 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,220 $0 Implemented
MS0405 # 01 Y:2022 01 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,844 $3,550 Not Implemented
MS0405 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,475 $2,866 Not Implemented
MS0405 # 03 Y:2022 03 2022 COMBINE UTILITY METERS $279 $0 Not Implemented
MS0405 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,755 $43,645 Not Implemented
MS0404 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $176,387 $1,148,430 Not Implemented
MS0404 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $9,805 $22,420 Not Implemented
MS0404 # 03 Y:2022 03 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $853 $525 Not Implemented