Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
894
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS021 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $36,978 | $9,000 | Not Implemented |
MAS021 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,123 | $77,100 | Not Implemented |
MAS021 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,077 | $8,000 | Implemented |
MAS021 # 05 Y:2012 | 05 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,883 | $3,120 | Implemented |
MAS021 # 06 Y:2012 | 06 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,590 | $3,120 | Implemented |
MAS021 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,154 | $2,000 | Not Implemented |
MAS018 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,121 | $172,430 | Not Implemented |
MAS018 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,975 | $6,000 | Not Implemented |
MAS018 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $29,548 | $92,700 | Not Implemented |
MAS018 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $19,133 | $2,100 | Not Implemented |
MAS018 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,200 | $1,775 | Not Implemented |
MAS018 # 06 Y:2012 | 06 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,270 | $22,500 | Not Implemented |
MAS018 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,027 | $0 | Not Implemented |
MAS018 # 08 Y:2012 | 08 | 2012 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $2,045 | $4,600 | Not Implemented |
MAS018 # 09 Y:2012 | 09 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,767 | $0 | Not Implemented |
MA0686 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,463 | $11,880 | Not Implemented |
MA0686 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,021 | $1,800 | Implemented |
MA0686 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,860 | $86,160 | Implemented |
MA0686 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,626 | $19,725 | Not Implemented |
MA0686 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,501 | $1,000 | Implemented |
MA0652 # 01 Y:2009 | 01 | 2009 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $11,122 | $1,990 | Not Implemented |
MA0652 # 02 Y:2009 | 02 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,132 | $23,474 | Implemented |
MA0652 # 03 Y:2009 | 03 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,667 | $0 | Not Implemented |
MA0652 # 04 Y:2009 | 04 | 2009 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,585 | $6,600 | Not Implemented |
MA0649 # 01 Y:2009 | 01 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,752 | $85,000 | Not Implemented |