IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0858 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $5,835 Not Implemented
GT0859 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,936 $12,000 Implemented
GT0859 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $13,504 $0 Not Implemented
GT0859 # 03 Y:2008 03 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,029 $0 Implemented
GT0859 # 04 Y:2008 04 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $9,526 $6,000 Implemented
OK0770 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,297 $0 Implemented
OK0770 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,597 $0 Implemented
OK0770 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $669 $1,056 Implemented
OK0770 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $8,014 $5,534 Not Implemented
OK0770 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,686 $17,885 Implemented
OK0770 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,894 $1,346 Not Implemented
OK0770 # 07 Y:2008 07 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $16,527 $0 Implemented
UF0417 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,847 $36,441 Not Implemented
UF0417 # 02 Y:2008 02 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,012 $0 Implemented
UF0417 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,710 $0 Implemented
UF0417 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $0 Implemented
UF0417 # 05 Y:2008 05 2008 INSTALL COMMON HEADER ON COMPRESSORS $14,617 $0 Not Implemented
UF0417 # 06 Y:2008 06 2008 INSTALL COMMON HEADER ON COMPRESSORS $12,647 $900 Not Implemented
UF0417 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,601 $64,339 Not Implemented
UF0417 # 08 Y:2008 08 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,201 $1,200 Not Implemented
UF0417 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $65,568 $31,410 Not Implemented
UF0417 # 10 Y:2008 10 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $45,096 $15,000 Not Implemented
UF0417 # 11 Y:2008 11 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,200 $4,158 Not Implemented
OR0543 # 01 Y:2008 01 2008 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $244,531 $29,019 Not Implemented
OR0543 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $61,542 $40,950 Implemented