IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0587 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $8,000 $5,000 Implemented
AM0587 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,460 $21,600 Implemented
AM0587 # 03 Y:2010 03 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $5,760 $1,030 Implemented
AM0587 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $5,087 $21,130 Not Implemented
AM0587 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,760 $42 Not Implemented
AM0587 # 06 Y:2010 06 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,250 $500 Implemented
AM0587 # 07 Y:2010 07 2010 INSTALL SKYLIGHTS $2,550 $2,030 Not Implemented
AM0587 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,521 $560 Implemented
AM0587 # 09 Y:2010 09 2010 USE SYNTHETIC LUBRICANT $980 $0 Not Implemented
UD0827 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $207 $585 Not Implemented
UD0827 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,123 $58,000 Not Implemented
UD0827 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,804 $5,800 Not Implemented
UD0827 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,258 $800 Not Implemented
UD0827 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $995 $500 Implemented
UD0827 # 06 Y:2010 06 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,685 $48,000 Not Implemented
UD0827 # 07 Y:2010 07 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $597 $50 Implemented
OK0800 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,533 $32,670 Not Implemented
OK0800 # 02 Y:2010 02 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,667 $2,700 Implemented
OK0800 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $334 Implemented
OK0800 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $860 $1,865 Implemented
OK0800 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,134 $706 Implemented
OK0800 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,134 $1,678 Implemented
OK0800 # 07 Y:2010 07 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,127 $0 Not Implemented
GT0876 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,786 $1,500 Implemented
GT0876 # 02 Y:2010 02 2010 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $307 $50 Not Implemented