Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0052 # 01 Y:2015 | 01 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,077 | $47 | Implemented |
IP0052 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $437 | $9 | Implemented |
IP0052 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,655 | $61 | Implemented |
IP0052 # 04 Y:2015 | 04 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $12,878 | $902 | Implemented |
IP0052 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $6,052 | $2,650 | Not Implemented |
IP0052 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,932 | $953 | Not Implemented |
IP0052 # 07 Y:2015 | 07 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $10,505 | $7,153 | Implemented |
IP0052 # 08 Y:2015 | 08 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $12,926 | $10,000 | Implemented |
IP0052 # 09 Y:2015 | 09 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,874 | $4,725 | Not Implemented |
IP0052 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $50 | $179 | Not Implemented |
IP0051 # 01 Y:2015 | 01 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,391 | $27 | Implemented |
IP0051 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,824 | $161 | Implemented |
IP0051 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,313 | $261 | Implemented |
IP0051 # 04 Y:2015 | 04 | 2015 | RECYCLE WHITE WATER | $1,246 | $108 | Implemented |
IP0051 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,713 | $534 | Not Implemented |
IP0051 # 06 Y:2015 | 06 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,349 | $2,149 | Not Implemented |
IP0051 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127 | $255 | Implemented |
IP0051 # 08 Y:2015 | 08 | 2015 | OPTIMIZE PLANT POWER FACTOR | $4,646 | $12,637 | Not Implemented |
IP0051 # 09 Y:2015 | 09 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $7,963 | $24,900 | Not Implemented |
IP0050 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,927 | $0 | Implemented |
IP0050 # 02 Y:2015 | 02 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,405 | $163 | Implemented |
IP0050 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,187 | $1,400 | Implemented |
IP0050 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $666 | $543 | Implemented |
IP0050 # 05 Y:2015 | 05 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,184 | $1,792 | Not Implemented |
IP0050 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,242 | $4,203 | Implemented |