Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0242 # 03 Y:2002 | 03 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,620 | $4,870 | Implemented |
WV0242 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $871 | $116 | Not Implemented |
WV0242 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,564 | $128 | Implemented |
WV0242 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $456 | $72 | Implemented |
WV0242 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $304 | $0 | Implemented |
WV0242 # 08 Y:2002 | 08 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,335 | $900 | Implemented |
WV0242 # 09 Y:2002 | 09 | 2002 | BURN WASTE OIL FOR HEAT | $5,537 | $4,000 | Not Implemented |
WV0242 # 10 Y:2002 | 10 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $864 | $400 | Implemented |
WV0242 # 11 Y:2002 | 11 | 2002 | INSTALL SENSORS TO DETECT DEFECTS | $127,500 | $13,480 | Not Implemented |
WV0242 # 12 Y:2002 | 12 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $28,000 | $12,000 | Not Implemented |
WV0229 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $948 | $300 | Implemented |
WV0229 # 02 Y:2001 | 02 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $776 | $750 | Implemented |
WV0229 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,684 | $4,400 | Not Implemented |
WV0229 # 04 Y:2001 | 04 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $3,599 | $350 | Not Implemented |
WV0229 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $1,215 | $450 | Implemented |
WV0229 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $400 | Not Implemented |
WV0229 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $861 | $400 | Not Implemented |
WV0229 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,323 | $1,200 | Implemented |
WV0229 # 09 Y:2001 | 09 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,189 | $11,368 | Not Implemented |
WV0229 # 10 Y:2001 | 10 | 2001 | INSTALL OCCUPANCY SENSORS | $2,118 | $450 | Not Implemented |
WV0229 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $100 | Implemented |
WV0229 # 12 Y:2001 | 12 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,680 | $220 | Implemented |
WV0229 # 13 Y:2001 | 13 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $45,000 | $15,000 | Implemented |
WV0229 # 14 Y:2001 | 14 | 2001 | ADVERTISE PRODUCT OR SERVICE | $13,200 | $2,000 | Implemented |
WV0228 # 01 Y:2001 | 01 | 2001 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $221 | $130 | Not Implemented |