Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0148 # 04 Y:1999 | 04 | 1999 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $31,525 | $21,597 | Not Implemented |
DS0148 # 05 Y:1999 | 05 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,858 | $800 | Implemented |
DS0148 # 06 Y:1999 | 06 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $750 | $50 | Implemented |
DS0148 # 07 Y:1999 | 07 | 1999 | RECOVER AND REUSE COOLING WATER | $652 | $1,260 | Implemented |
DS0148 # 08 Y:1999 | 08 | 1999 | BURN WASTE OIL FOR HEAT | $591 | $1,695 | Not Implemented |
DS0148 # 09 Y:1999 | 09 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,846 | $0 | Implemented |
DS0148 # 10 Y:1999 | 10 | 1999 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $439 | $1,000 | Not Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,322 | $1,500 | Not Implemented |
UM0149 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,107 | $10,500 | Not Implemented |
UM0149 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,804 | $0 | Not Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 07 Y:1999 | 07 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $357,000 | $714,000 | Not Implemented |
WV0180 # 01 Y:1999 | 01 | 1999 | USE SYNTHETIC LUBRICANT | $1,188 | $867 | Implemented |
WV0180 # 02 Y:1999 | 02 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30 | $0 | Implemented |
WV0180 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $87 | $423 | Not Implemented |
WV0180 # 04 Y:1999 | 04 | 1999 | USE OPTIMUM THICKNESS INSULATION | $2,992 | $1,125 | Not Implemented |
WV0180 # 05 Y:1999 | 05 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $39,780 | $3,000 | Implemented |
WV0180 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,447 | $27 | Not Implemented |
WV0180 # 07 Y:1999 | 07 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $71,180 | $39,000 | Not Implemented |
WV0180 # 08 Y:1999 | 08 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $370 | $90 | Not Implemented |
WV0180 # 09 Y:1999 | 09 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $550 | $201 | Implemented |
WV0180 # 10 Y:1999 | 10 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $750 | $250 | Not Implemented |
WV0180 # 11 Y:1999 | 11 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,107 | $50 | Not Implemented |